Half-Cent Projects

Phases Facility Project Description
1. Planning PGES School Wide: HVAC Replacement
2. Design CES Bldgs. 1, 4, 5 & 6: Bldg Env Repairs w/Cafe Walkway Drainage
2. Design EES Bldg 4 Roof Replacement
2. Design Fac Ops HVAC
2. Design HHS Theater Renovation
2. Design Transportation (2) EHPA Generators
2. Design WHMS Bldg. 7: LED & Emergency Lighting / Ceilings
2. Design Endeavor Roof Replacement
2. Design SHS Theater Renovation
2. Design CES Roof Replacement
4. Construction CHS Exterior Lighting
4. Construction NCTHS Bldgs. 1, 2 & 7: Building Envelope Repairs
4. Construction WES Canopy & Lighting
4. Construction HHS School Wide: HVAC Replacement
4. Construction HHS Fire Alarm Replacement
4. Construction SHS Athletic Field Lighting Replacement
4. Construction WES Emer. & Exit Lighting Replacement
4. Construction County Wide FEMA generator replace nuts, bolts and paint
5. Close Out FCMS Multiple Buildings: Roof Replacement
5. Close Out PGES HVAC Chilled Water Piping Replacement
6. Warranty HHS Intercom System Replacement
6. Warranty WHMS School Wide: Egress Window Replacement
6. Warranty FacOps Thermal Insulation Replacement (Phase 1)
6. Warranty HHS Bldg. 24: Roof Replacement
6. Warranty JDFES School Wide: HVAC Replacement
6. Warranty Multiple Sites Gym Floor Repair/Resurfacing (5 HS, 2 MS)
6. Warranty PGES School Wide: Roof Replacement
6. Warranty WHMS Gym Floor and Bleacher Replacement
7. Complete CHS Upgrade Fire alarm system
7. Complete County Wide Fencing
7. Complete County Wide County wide flooring
7. Complete County Wide Intercom upgrades/Fire Alarm
7. Complete DSPMS Gym Bldg. New Electrical Room (in Classroom)
7. Complete HHS Replace PA System
7. Complete HHS Press Box
7. Complete HHS Construct ADA compliant restrooms/baseball
7. Complete SHS Replace fire alarm system
7. Complete SHS Gym floor and bleachers
7. Complete SHS Track replacement
7. Complete WHMS Phase 2 HVAC Upgrades
On-Going County Wide County Wide Project - Maintenance